Other

FLOWLINE

by · built with an AI coding agent · plays free at flowline.games.bu.app

FLOWLINE — gameplay screenshot showing other action
FLOWLINE running in a browser — frame captured by our harness on 2026-10-15.
â–¶ Play FLOWLINE

Free, no install, runs in the browser. Hosted by its creator at flowline.games.bu.app — the link opens their site, not a copy on ours.

What FLOWLINE is

FLOWLINE is a other game by None. Endless snowboarding on a shared mountain It is a 660 KB download that loaded in 3.2s when we tested it and renders with WebGL.

FLOWLINE: measured

We loaded FLOWLINE in a real headless Chrome, played it, and recorded what it did. Blank cells are facts we could not measure, not zeros.

Download660 KBTotal bytes fetched on first load.
Loads in3.2sTime to the load event on a desktop connection.
Frame cost8.4 ms — comfortably inside the 60 fps budgetCost of one frame while playing, sampled in a headless browser with vsync off — so this is how long the game takes to draw, not the rate your screen refreshes. A 60 Hz display allows 16.7 ms; 95th percentile 17 ms. GPU run (assertGpu-equivalent check passed), renderer: ANGLE (NVIDIA, NVIDIA GeForce RTX 4070 Laptop GPU (0x00002860) Direct3D11 vs_5_0 ps_5_0, D; sampled with up to 7 surveys sharing the GPU, so an upper bound
RendererANGLE (NVIDIA, NVIDIA GeForce RTX 4070 Laptop GPU (0x00002860) Direct3D11 vs_5_0 ps_5_0, DWhat the game draws with.
Requests5Files fetched — a low count means a self-contained build.
On a phoneFits a 390px screenMeasured in a 390×844 viewport.

Method and the full comparison: how we measured these games · what games like this cost to build.

FLOWLINE FAQ

Is FLOWLINE free to play?

Yes. FLOWLINE is free and runs in your browser at flowline.games.bu.app — no download, no install and no account. It was made by None.

What kind of game is FLOWLINE?

FLOWLINE is a other game. Endless snowboarding on a shared mountain

Does FLOWLINE work on mobile?

It fits a phone screen — we measured no horizontal overflow in a 390×844 viewport. We did not detect touch controls, so a keyboard and mouse may still be needed.

How big is FLOWLINE?

660 KB on first load, across 5 requests, loading in about 3.2 seconds.

Who made FLOWLINE?

None, using an AI coding agent. It is one of 393 games built this way that we catalogue and measure.

Credit

FLOWLINE was made by and is hosted on their own site at flowline.games.bu.app. EveryGameMade does not host or claim this game — this page is a catalogue entry, the screenshot is a frame we captured of it running, and the specs are our own measurements. Creators: get in touch to correct or remove an entry.